A home is built on trust.
What is that trust built on?

VIBS

36 recurring problems in new construction

From planning application to finished home · problems, measures and sources

36 types of problems that VIBS could help prevent, identify earlier or make easier to manage. The overview draws on professional articles, official guidance, inspection reports and documented criminal cases.

36 %

of building applications in 2024 were incomplete, according to Norway's Ministry of Local Government and Regional Development.

Source: Ministry of Local Government and Regional Development
At least 75%

of building damage is likely to be moisture-related, according to SINTEF's assessment in 2026.

Source: SINTEF

These figures concern building applications and building damage generally, not only new homes. The list follows the construction process and is not ranked by frequency.

The sources document the problems and risk factors. The proposed VIBS measures describe potential uses and further development of the platform. Their effect depends on the features being available, used and followed up with appropriate professional checks.

Applications and design

  1. Incomplete building application

    Missing information leads to additional review rounds, delays and extra work.

    Source: Ministry of Local Government and Regional Development

    How VIBS could help

    Bring together application documents, highlight missing attachments and assign responsibility for each document before submission.

  2. The building is changed without updating the permit

    Differences between the approved and built solution can delay the completion certificate and require remedial work.

    Source: DiBK

    How VIBS could help

    Send change requests to the responsible applicant to assess whether an amended application is needed before work proceeds.

  3. A building permit is mistaken for a technical quality check

    The responsible companies remain accountable for meeting technical requirements, even when the municipality has granted a permit.

    Source: Ministry of Local Government and Regional Development

    How VIBS could help

    Show separate statuses for the municipal permit, design, construction checks and documented non-conformities.

  4. Construction begins before the design is complete

    This can lead to improvised solutions and costly rework. SINTEF describes it as a recurring challenge.

    Source: SINTEF

    How VIBS could help

    Link the start of work activities to approved drawings and resolved technical details.

  5. Responsibilities fall between trades

    Interfaces between structures, products and trades are not sufficiently coordinated.

    Source: SINTEF

    How VIBS could help

    Assign a responsible company to each deliverable and require clarification between affected trades before work continues.

  6. Different drawing revisions are used on site

    Shared access to up-to-date drawings is a documented measure for reducing errors.

    Source: SINTEF

    How VIBS could help

    Maintain one current drawing revision, keep the revision history and notify those affected by changes.

Quotes, contracts and costs

  1. The homeowner and contractor expect different specifications

    Vague descriptions make it difficult to establish what was actually ordered.

    Source: SINTEF

    How VIBS could help

    Link specific products, specifications and room schedules to the approved quote.

  2. The total price and exclusions are unclear

    The homeowner lacks an overview of what is included and which costs will be added.

    Source: Norwegian Consumer Council

    How VIBS could help

    Show the contract sum, qualifications, optional extras and excluded items together.

  3. Additional work is ordered without an agreed price

    Verbal agreements can result in disputes about the order, scope and payment.

    Source: Norwegian Consumer Council

    How VIBS could help

    Document the scope and price of each change, with identifiable approval before work begins.

  4. The completion date and time implications of changes are unclear

    Disputes arise over delays and who caused them.

    Source: Norwegian Consumer Council

    How VIBS could help

    Link agreed deadlines, notices and time implications to the project schedule.

  5. The homeowner's own work is poorly defined

    Unclear responsibilities and timing can cause waiting time and conflict with the contractor's work.

    Source: Norwegian Consumer Council

    How VIBS could help

    Describe the homeowner's work, its deadline and dependencies on other trades.

  6. The contractor's guarantee is not checked

    Missing financial security increases the homeowner's risk, particularly in the event of insolvency.

    Source: Norwegian Consumer Council

    How VIBS could help

    Record guarantee documentation, amounts and validity as a checkpoint before payment.

  7. Payments run ahead of documented progress

    The homeowner may pay for value that has not yet been added to the project.

    Source: Norwegian Consumer Council

    How VIBS could help

    Link the payment schedule and bank report to checked milestones and documented deliveries.

Construction products and product documentation

  1. Products or specifications differ from what was agreed

    Departures from the agreement can lead to defects and disputes over remedial work or price reductions.

    Source: Norwegian Consumer Council

    How VIBS could help

    Compare quotes, approved product substitutions, invoices and delivery checks.

  2. Construction products have incomplete or inaccurate documentation

    DiBK has identified incorrect declarations and documentation gaps for timber cladding, among other products. The errors were corrected following inspections.

    Source: DiBK

    How VIBS could help

    Link the correct product identity to its declaration of performance, instructions and documented checks before use.

  3. CE marking is treated as proof that a product is suitable everywhere

    Documented properties and certificates must be assessed against the intended use.

    Source: SINTEF

    How VIBS could help

    Require a professional assessment of the product's suitability for the relevant building element.

  4. Products are installed incorrectly or combined into undocumented solutions

    Modifications to proven systems can undermine their performance.

    Source: SINTEF

    How VIBS could help

    Make installation instructions available and refer departures from the design to the designer for assessment.

Construction and quality control

  1. Damp materials are enclosed

    Insufficient drying can cause moisture problems and require completed structures to be opened up.

    Source: SINTEF

    How VIBS could help

    Record moisture measurements and approval before walls, roofs and floors are closed up.

  2. Water enters from the ground, windows or terraces

    SINTEF identifies these as recurring causes of building damage.

    Source: SINTEF

    How VIBS could help

    Include checks of drainage, seals and interfaces while the work remains accessible.

  3. Bathrooms develop leaks or inadequate drainage

    Defects can require extensive work in a completed wet room.

    Source: SINTEF

    How VIBS could help

    Document checks of floor gradients, drain connections and waterproofing before finishing surfaces.

  4. Air leakage reduces comfort and energy performance

    Airtightness also affects moisture safety and indoor air quality.

    Source: SINTEF

    How VIBS could help

    Follow up airtightness tests, deviations and remedial work, and link the results to energy documentation.

  5. Fire compartmentation and penetrations are installed incorrectly

    SINTEF describes inadequate fire stopping as a recurring problem.

    Source: SINTEF

    How VIBS could help

    Link each penetration to the fire safety drawings, selected solution, installer and inspection before enclosure.

  6. Sound insulation between homes is inadequate

    Insufficient design and unsuitable connections between structures can cause noise problems.

    Source: SINTEF

    How VIBS could help

    Document acoustic requirements, construction details, checkpoints and necessary measurements.

  7. Ventilation is handed over without proper balancing

    This can result in noise, draughts and uneven airflow.

    Source: SINTEF

    How VIBS could help

    Require a ventilation balancing report and documented follow-up of deviations before handover.

  8. Critical work is concealed before being checked

    Sealing and penetrations are among the issues DiBK highlights for inspections.

    Source: DiBK

    How VIBS could help

    Include checks before enclosure, with photos, measurements, location and the responsible inspector.

Completion and handover

  1. Management, operation and maintenance documentation is incomplete or hard to find

    Inadequate transfer of information to building operations is a documented challenge.

    Source: SINTEF

    How VIBS could help

    Collect management, operation and maintenance documentation (FDV) continuously for each product and building element, and identify missing deliverables.

  2. The final documentation describes an earlier design

    Documentation should reflect the building as actually constructed.

    Source: DiBK

    How VIBS could help

    Let approved changes update the product list, drawings and handover documentation.

  3. Completion or occupancy permission is unresolved when moving in

    Unresolved issues can delay lawful occupation.

    Source: DiBK

    How VIBS could help

    Show missing declarations, checks and regulatory clarifications in a consolidated completion overview.

  4. Defects at handover are not clearly recorded and followed up

    Disagreement about what was reported makes remedial work harder.

    Source: Norwegian Consumer Council

    How VIBS could help

    Use a handover record with photos, responsible companies, deadlines and confirmed resolution.

Working environment, responsible business and social responsibility

The points below describe documented risks. They do not imply that crime occurs in most building projects.

  1. Lack of an overview of workers and subcontractors

    The Norwegian Labour Inspection Authority found many missing HSE cards during inspections in 2025.

    Source: Norwegian Labour Inspection Authority

    How VIBS could help

    Link people to their employer, trade and project, with checked documentation and an up-to-date overview.

  2. Work is carried out without sufficient training and competence

    This is among the accident factors highlighted by the Norwegian Labour Inspection Authority.

    Source: Norwegian Labour Inspection Authority

    How VIBS could help

    Link tasks to competence requirements and record completed training before assignment.

  3. Risk assessments are generic or not followed

    The Norwegian Labour Inspection Authority has also found cases where a safe job analysis was completed but not followed.

    Source: Norwegian Labour Inspection Authority

    How VIBS could help

    Link risk assessments and measures to the specific job, with an assigned person and on-site follow-up.

  4. Breaches of pay and working conditions are hidden in the supply chain

    Inspections have identified breaches involving employment contracts, working hours and overtime pay.

    Source: Norwegian Labour Inspection Authority

    How VIBS could help

    Support supplier follow-up with review deadlines and documented checks, with access restricted to appropriate people.

  5. Fictitious invoices and payment for work not performed

    Økokrim has documented organised networks involving fictitious invoicing in construction and other industries.

    Source: Økokrim

    How VIBS could help

    Link invoices to orders, contractors, received deliveries and approval. Refer unexplained differences for review.

  6. Corruption and undisclosed conflicts of interest in procurement

    DFØ highlights internal controls, transparency and verifiability as preventive measures.

    Source: DFØ / Anskaffelser.no

    How VIBS could help

    Document quotes, reasons for supplier selection, conflict-of-interest checks and approvals, retaining their history.

  7. Waste disposal is paid for but carried out irresponsibly or illegally

    Økokrim describes dumping and mixing waste as known methods.

    Source: Økokrim

    How VIBS could help

    Link waste deliveries to the carrier, receiving facility, quantities and receipts, and follow up discrepancies.

Agreements, deliveries and checks must be connected

VIBS has preventive potential when agreements, changes, deliveries, checks and payments can be followed together. This provides a basis for resolving disagreements before ordering, identifying errors before they are built in and checking the basis for payment before funds are released.

It is essential to distinguish between ordered, delivered, installed and checked. A product identifier or invoice alone does not document what has actually been installed. For technical errors and crime, the impact still depends on real checks and follow-up.

The sources support the need for these measures. They do not demonstrate that VIBS has already achieved a specific reduction in errors or costs. Sources reviewed on 4 October 2026.

Confidence from the first quote to your finished home.

VIBS gives you and your contractor a shared place for agreements, changes and documentation. Follow what you have agreed, what changes cost and what happens next.

From an idea to a clear agreement.

You have an idea or drawings and are ready to request quotes. What is included, which materials and specifications do you want, and how do your choices fit your budget?

Together with the contractor, you clarify the scope, price, schedule and responsibilities. Drawings and room specifications describe what will be delivered. This forms the basis of your agreement.

VIBS brings quotes, choices and clarifications together, giving you a shared starting point before work begins.

How it works

Your construction project.
Together in VIBS.

Choose a feature or use the mouse wheel over the phone to scroll up and down. The demo continues automatically at a gentle pace.

Report
Bank adviser reviewing project plans

Banking

A clearer basis
for the bank.

Bring together agreements, costs and progress for discussions about your construction loan.

Inspection of the home’s technical systems

Insurance

Maintenance that
helps prevent damage.

VIBS creates a maintenance plan based on the home’s product documentation. Service and inspection reminders help reduce the risk of damage.

Property valuer inspecting the home with a tablet and laser measure

Valuation

A better basis
for property valuation.

Documents, deliveries, maintenance records and EPD data together provide a better basis for property valuation.

VIBS

VIBS Verified

Research and development for the construction industry

Working towards a new standard in construction.

Alongside the VIBS platform, we are working on the VIBS Verified research project. The aim is to develop a new standard for traceable documentation of quality, energy and climate in construction projects.

We will investigate how documented qualities can provide a better basis for decisions in construction, banking and insurance.

Read about the research project at vibsverified.com
Illustrated tradespeople working together on a building site

Collaboration is the key
to a good result.

When the trades, homeowner, bank and insurer work from a shared basis, it becomes easier to clarify expectations, make sound decisions and develop a shared sense of ownership of the project.

VIBS

Ask about VIBS

Open the guide and get answers to your questions.
VIBSHello! What would you like to know? Ask about pricing, changes or how to access your project.

Next step

Want VIBS
in your building project?

Ask your contractor to use VIBS and give you access. It is free for you as a homeowner.

Ask your contractor about VIBS
Hello! I would like us to use VIBS for our building project, bringing together agreements, changes, progress and documentation. Could you set up the project and give me access?

Get it on Google PlayDownload on the App Store
Open VIBS in your browser
VIBS

How to register with VIBS

For homeowners and main contractors · registration on a computer · video in Norwegian

Open video directly